Milwaukee, WI
Hunzinger Construction Company served as the General Contractor for the Milwaukee Brewers Baseball Club on the 10,800 square foot NYCE Club. The project included a new club entrance relocation of the main bar area to provide an open flow to the seating area. The new main bar was constructed of new cherry hardwood and siltstone bar tops. The existing buffet was updated with a new Imago veneer panel, as well as four action stations. New carpet and hard tile floors have been accented with glass tile and new vinyl wall covering have been installed throughout. The new acoustical ceiling grid & tile provides a brighter feeling to the space. New light fixtures and LCD televisions have been installed throughout the club in addition to new club signage and furniture.