Dawson Construction
Construction of the Whitman Lake Hydroelectric Project included temporary hatchery water supply bypass, access trail and laydown, powerhouse and tailrace structures, switchyard, powerhouse crane, hatchery head tank, intakes and valve house and pipelines from dam to powerhouse. A new 2,400 sf pre-engineered metal building power house was constructed, and ½ mile of new pipe line for water supply to the power house.